Jl. Pahlawan No.45 Kav.2 Rempoa Ciputat Timur Tangerang Selatan

info@distributorpompaair.com

Design
Sewage lifting unit with 2 integrated pumps

Application

Sewage lifting unit for drainage of residential housing and commercial buildings (e.g. restaurants, department stores, etc.). Raw sewage that cannot be piped to the sewer system through the use of natural inclines and sewage from toilet systems below the backflow level are to be piped to the public sewer system by means of an automatic lifting unit in accordance with DIN EN 12056/DIN 1986-100. Sewage containing mineral oils or explosive admixtures must be guided through oil precipitators and/or petrol precipitators; those containing fatty substances must go through grease traps and those with sand through sand catchers. In cases where the flow to the lifting unit must not be interrupted during normal operation, one lifting unit must be equipped with a second pumping unit that has the same performance capacity and switches on automatically when needed (DIN EN 12050-1 A1).

Materials

Technical data

Equipment/function

Description/design

Fully submersible sewage lifting unit, ready for connection (flooding height: 2 mWS, overflow time: 7 days) with a collection tank that is impermeable to gas and water and that is equipped with buoyancy safeguards. Centrifugal pump with vortex impeller.

DrainLift XL2:

Double-pump system for automatic operation (with automatic duty cycling, standby and peak-load operation). Due to the integrated double non-return valve, only one pressure pipe connection is required. Switchgear with CEE plug, potential-free contact, integrated alarm. Pumps with integrated sheath current cooling.

Attention: The switchgear is not submersible and must therefore be arranged in such a way that it is overflow-proof.

Scope of delivery

Connection-ready sewage lifting unit, including:

 

EBARA               GRUNDFOS              KSB              WILO